The S3 truss is prepared for transport to the O&C

[KSC-00PP-1870]


  • Photo Number: KSC-00PP-1870

  • Release Date: 07-Dec-2000

  • Description: At the Shuttle Landing Facility, cranes position the Integrated Truss Structure S3 onto a flatbed trailer for transport to the Operations and Checkout Building. The S3 arrived aboard a Super Guppy aircraft. The second starboard truss segment of the International Space Station, the S3 truss is scheduled to be added to the Station in April 2003.

    Resolution Format Width
    (Pixels)
    Height
    (Pixels)
    Size
    (Bytes)
    Thumbnail GIF 75 100 11427
    Slide GIF 118 156 26759
    Low GIF 180 240 61775
    Medium JPEG 578 768 83460
    High JPEG 2009 2670 1024131

    Point of Contact

    Name: NASA Kennedy Space Center

    Address:

    KSC Public Affairs Office
    National Aeronautics and Space Administration
    John F. Kennedy Space Center
    Kennedy Space Center, Florida 32899
    

    NIX Search KSC Search


    DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)


    Photos By: National Aeronautics and Space Administration
    Scanned By: Seven/Still Photo Imaging
    Captions: InDyne, Inc.
    Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
    Last Updated: Friday October 24 12:28:06 EDT 2003 (Anita Barrett)

    A service of the NASA Image Exchange (NIX)