The S3 truss is prepared for transport to the O&C
|
Photo Number: KSC-00PP-1870
Release Date: 07-Dec-2000
|
Description:
At the Shuttle Landing Facility, cranes position the Integrated Truss Structure S3 onto a flatbed trailer for transport to the Operations and Checkout Building. The S3 arrived aboard a Super Guppy aircraft. The second starboard truss segment of the International Space Station, the S3 truss is scheduled to be added to the Station in April 2003.
| Resolution |
Format |
Width (Pixels) |
Height (Pixels) |
Size (Bytes) |
Thumbnail |
GIF |
75 |
100 |
11427 |
Slide |
GIF |
118 |
156 |
26759 |
Low |
GIF |
180 |
240 |
61775 |
Medium |
JPEG |
578 |
768 |
83460 |
High |
JPEG |
2009 |
2670 |
1024131 |
Point of Contact
Name: NASA Kennedy Space Center
Address:
KSC Public Affairs Office
National Aeronautics and Space Administration
John F. Kennedy Space Center
Kennedy Space Center, Florida 32899
NIX Search
KSC Search
DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)
Photos By: National Aeronautics and Space Administration
Scanned By: Seven/Still Photo Imaging
Captions: InDyne, Inc.
Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
Last Updated: Friday October 24 12:28:06 EDT 2003 (Anita Barrett) A service of the NASA Image Exchange (NIX)