Workers begin removing the broken cleat from the crawler- transporter track
|
Photo Number: KSC-00PP-1631
Release Date: 31-Oct-2000
Keywords: SHUTTLE,sts-97
|
Description:
A worker adjusts equipment to remove a broken cleat (shoe) on the crawler-transporter moving the Space Shuttle Endeavour to Launch Pad 39B. The crack was noticed as the crawler-transporter started up the incline to the pad. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections.
| Resolution |
Format |
Width (Pixels) |
Height (Pixels) |
Size (Bytes) |
Thumbnail |
GIF |
100 |
69 |
7745 |
Slide |
GIF |
172 |
151 |
37447 |
Low |
GIF |
320 |
221 |
54617 |
Medium |
JPEG |
1024 |
708 |
157420 |
High |
JPEG |
2670 |
1845 |
799025 |
Point of Contact
Name: NASA Kennedy Space Center
Address:
KSC Public Affairs Office
National Aeronautics and Space Administration
John F. Kennedy Space Center
Kennedy Space Center, Florida 32899
NIX Search
KSC Search
STS-97 Photo Index
DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)
Photos By: National Aeronautics and Space Administration (taken by Aerospace Imaging/Johnson Controls)
Scanned By: Seven/Still Photo Imaging
Captions: Information Dynamics, Inc (Kay Grinter, Anita Barrett, and Elaine Liston)
Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
Last Updated: Friday October 24 12:01:56 EDT 2003 (J. Dumoulin ) A service of the NASA Image Exchange (NIX)