STS-92 Discovery is lifted in the VAB for stacking

[KSC-00PP-1206]


  • Photo Number: KSC-00PP-1206

  • Release Date: 24-Aug-2000

  • Keywords: SHUTTLE,sts-92
  • Description: In the transfer aisle of the Vehicle Assembly Building, an overhead crane suspends the orbiter Discovery in a vertical position before transfer to high bay 3 where it will be mated to an external tank and solid rocket boosters. Discovery is scheduled to launch Oct. 5 at 9:30 p.m. EDT on mission STS-92, delivering two elements of the International Space Station: the Z-1 truss and Pressurized Mating Adapter-3. The launch will be the 100th flight in the Shuttle program.

    Resolution Format Width
    (Pixels)
    Height
    (Pixels)
    Size
    (Bytes)
    Thumbnail GIF 79 100 8670
    Slide GIF 121 156 27464
    Low GIF 189 240 39893
    Medium JPEG 604 768 119446
    High JPEG 2101 2670 876935

    Point of Contact

    Name: NASA Kennedy Space Center

    Address:

    KSC Public Affairs Office
    National Aeronautics and Space Administration
    John F. Kennedy Space Center
    Kennedy Space Center, Florida 32899
    

    NIX Search KSC Search STS-92 Photo Index


    DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)


    Photos By: National Aeronautics and Space Administration (taken by Aerospace Imaging/Johnson Controls)
    Scanned By: Seven/Still Photo Imaging
    Captions: Information Dynamics, Inc (Kay Grinter, Anita Barrett, and Elaine Liston)
    Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
    Last Updated: Friday October 24 11:57:20 EDT 2003 (J. Dumoulin )

    A service of the NASA Image Exchange (NIX)