STS-92 Discovery is lifted in the VAB for stacking

[KSC-00PP-1205]


  • Photo Number: KSC-00PP-1205

  • Release Date: 24-Aug-2000

  • Keywords: SHUTTLE,sts-92
  • Description: The orbiter Discovery is in the transfer aisle of the Vehicle Assembly Building where workers on scaffolding look it over. The orbiter will be lifted and transferred to high bay 3 to be mated to an external tank and solid rocket boosters. Discovery is scheduled to launch Oct. 5 at 9:30 p.m. EDT on mission STS-92, delivering two elements of the International Space Station: the Z-1 truss and Pressurized Mating Adapter-3. The launch will be the 100th flight in the Shuttle program.

    Resolution Format Width
    (Pixels)
    Height
    (Pixels)
    Size
    (Bytes)
    Thumbnail GIF 80 100 8236
    Slide GIF 122 156 27699
    Low GIF 192 240 35354
    Medium JPEG 614 768 111569
    High JPEG 2136 2670 845964

    Point of Contact

    Name: NASA Kennedy Space Center

    Address:

    KSC Public Affairs Office
    National Aeronautics and Space Administration
    John F. Kennedy Space Center
    Kennedy Space Center, Florida 32899
    

    NIX Search KSC Search STS-92 Photo Index


    DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)


    Photos By: National Aeronautics and Space Administration (taken by Aerospace Imaging/Johnson Controls)
    Scanned By: Seven/Still Photo Imaging
    Captions: Information Dynamics, Inc (Kay Grinter, Anita Barrett, and Elaine Liston)
    Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
    Last Updated: Tuesday August 28 18:32:53 EDT 2001 (J. Dumoulin)

    A service of the NASA Image Exchange (NIX)