STS-92 Discovery rolls to the VAB for stacking
|
Photo Number: KSC-00PP-1204
Release Date: 24-Aug-2000
Keywords: SHUTTLE,sts-92
|
Description:
The orbiter Discovery reaches its destination, the transfer aisle of the Vehicle Assembly Building. There it will be lifted to vertical , then raised and moved to high bay 3 for mating with the external tank and solid rocket boosters. Discovery is scheduled to launch Oct. 5 at 9:30 p.m. EDT on mission STS-92, delivering two elements of the International Space Station: the Z-1 truss and Pressurized Mating Adapter-3. The launch will be the 100th flight in the Shuttle program.
| Resolution |
Format |
Width (Pixels) |
Height (Pixels) |
Size (Bytes) |
Thumbnail |
GIF |
100 |
67 |
7259 |
Slide |
GIF |
172 |
149 |
36929 |
Low |
GIF |
320 |
215 |
51896 |
Medium |
JPEG |
1024 |
687 |
166880 |
High |
JPEG |
2670 |
1792 |
933318 |
Point of Contact
Name: NASA Kennedy Space Center
Address:
KSC Public Affairs Office
National Aeronautics and Space Administration
John F. Kennedy Space Center
Kennedy Space Center, Florida 32899
NIX Search
KSC Search
STS-92 Photo Index
DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)
Photos By: National Aeronautics and Space Administration (taken by Aerospace Imaging/Johnson Controls)
Scanned By: Seven/Still Photo Imaging
Captions: Information Dynamics, Inc (Kay Grinter, Anita Barrett, and Elaine Liston)
Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
Last Updated: Tuesday August 28 18:32:51 EDT 2001 (J. Dumoulin) A service of the NASA Image Exchange (NIX)