STS-92 Discovery rolls to the VAB for stacking

[KSC-00PP-1200]


  • Photo Number: KSC-00PP-1200

  • Release Date: 24-Aug-2000

  • Keywords: SHUTTLE,sts-92
  • Description: The orbiter Discovery is rolled out of the Orbiter Processing Facility bay 3 for transfer to the Vehicle Assembly Building, where it will be mated with its external tank and solid rocket boosters. Discovery is scheduled to launch Oct. 5 at 9:30 p.m. EDT on mission STS-92, delivering two elements of the International Space Station: the Z-1 truss and PMA-3. The launch will be the 100th flight in the Shuttle program.

    Resolution Format Width
    (Pixels)
    Height
    (Pixels)
    Size
    (Bytes)
    Thumbnail GIF 100 69 7299
    Slide GIF 172 151 37447
    Low GIF 320 221 48734
    Medium JPEG 1024 707 137786
    High JPEG 2620 1808 767882

    Point of Contact

    Name: NASA Kennedy Space Center

    Address:

    KSC Public Affairs Office
    National Aeronautics and Space Administration
    John F. Kennedy Space Center
    Kennedy Space Center, Florida 32899
    

    NIX Search KSC Search STS-92 Photo Index


    DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)


    Photos By: National Aeronautics and Space Administration (taken by Aerospace Imaging/Johnson Controls)
    Scanned By: Seven/Still Photo Imaging
    Captions: Information Dynamics, Inc (Kay Grinter, Anita Barrett, and Elaine Liston)
    Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
    Last Updated: Tuesday August 28 18:32:44 EDT 2001 (J. Dumoulin)

    A service of the NASA Image Exchange (NIX)