STS-106 orbiter Atlantis rolls out to Launch Pad 39-B
|
Photo Number: KSC-00PP-1120
Release Date: 14-Aug-2000
Keywords: SHUTTLE,sts-106
|
Description:
Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106.
| Resolution |
Format |
Width (Pixels) |
Height (Pixels) |
Size (Bytes) |
Thumbnail |
GIF |
66 |
100 |
6811 |
Slide |
GIF |
110 |
156 |
24880 |
Low |
GIF |
158 |
240 |
54425 |
Medium |
JPEG |
507 |
768 |
95157 |
High |
JPEG |
1763 |
2670 |
958473 |
Point of Contact
Name: NASA Kennedy Space Center
Address:
KSC Public Affairs Office
National Aeronautics and Space Administration
John F. Kennedy Space Center
Kennedy Space Center, Florida 32899
NIX Search
KSC Search
STS-106 Photo Index
DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)
Photos By: National Aeronautics and Space Administration (taken by Aerospace Imaging/Johnson Controls)
Scanned By: Seven/Still Photo Imaging
Captions: Information Dynamics, Inc (Kay Grinter, Anita Barrett, and Elaine Liston)
Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
Last Updated: Tuesday August 28 18:29:49 EDT 2001 (M. Downs) A service of the NASA Image Exchange (NIX)