STS-106 orbiter Atlantis rolls out to Launch Pad 39-B

[KSC-00PP-1119]


  • Photo Number: KSC-00PP-1119

  • Release Date: 14-Aug-2000

  • Keywords: SHUTTLE,sts-106
  • Description: Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, inches its way to Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106.

    Resolution Format Width
    (Pixels)
    Height
    (Pixels)
    Size
    (Bytes)
    Thumbnail GIF 66 100 6699
    Slide GIF 110 156 24880
    Low GIF 159 240 54786
    Medium JPEG 509 768 101454
    High JPEG 1771 2670 1028847

    Point of Contact

    Name: NASA Kennedy Space Center

    Address:

    KSC Public Affairs Office
    National Aeronautics and Space Administration
    John F. Kennedy Space Center
    Kennedy Space Center, Florida 32899
    

    NIX Search KSC Search STS-106 Photo Index


    DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)


    Photos By: National Aeronautics and Space Administration (taken by Aerospace Imaging/Johnson Controls)
    Scanned By: Seven/Still Photo Imaging
    Captions: Information Dynamics, Inc (Kay Grinter, Anita Barrett, and Elaine Liston)
    Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
    Last Updated: Tuesday August 28 18:29:47 EDT 2001 (M. Downs)

    A service of the NASA Image Exchange (NIX)