{author} National Aeronautics and Space Administration (taken by
Bionetics)
{captionsby} Sherikon Space Systems (Susan Walsh, Chuck Weirauch and Paula
Shawa)
{category} SHUTTLE.sts-87
{date} 29-Oct-1997
{description} The orbiter Columbia, mated to its external tank and two solid
rocket boosters, is rolled out onto Kennedy Space Centers Pad 39-
B. Columbia is scheduled to launch on Nov. 19 for STS-87 on a 16-
day flight of the United States Microgravity Payload (USMP)-4
mission. This mission also features the deployment and retrieval
of the Spartan-201 satellite and a spacewalk to demonstrate
assembly and maintenance operations for future use on the
International Space Station.
{highres} 1536 x 2304
{highsize} 818385
{hightype} JPEG
{keywords} SHUTTLE,sts-87
{lasteditor} M.
Downs
{lowres} 160 x 240
{lowsize} 30043
{lowtype} GIF
{mediumres} 512 x 768
{mediumsize} 106986
{mediumtype} JPEG
{number} KSC-97PC-1579
{scannedby} Bionetics and NASA/KSC Internet Lab (Dumoulin, Downs)
{slideres} 111 x 156
{slidesize} 25115
{slidetype} GIF
{tinyres} 67 x 100
{tinysize} 10231
{tinytype} GIF
{title} STS-87 Columbia rolls out to LC 39B in preparation for launch
{type} Image
{end}