STS-87 Columbia rolls out to LC 39B in preparation for launch

[KSC-97PC-1577]


  • Photo Number: KSC-97PC-1577

  • Release Date: 29-Oct-1997

  • Keywords: SHUTTLE,sts-87
  • Description: The orbiter Columbia, mated to its external tank and two solid rocket boosters, rolls out to Kennedy Space Centers (KSCs) Pad 39-B. Columbia is scheduled to launch on Nov. 19 for STS-87 on a 16-day flight of the United States Microgravity Payload (USMP)-4 mission. This mission also features the deployment and retrieval of the Spartan-201 satellite and a spacewalk to demonstrate assembly and maintenance operations for future use on the International Space Station.

    Resolution Format Width
    (Pixels)
    Height
    (Pixels)
    Size
    (Bytes)
    Thumbnail GIF 67 100 10231
    Slide GIF 111 156 25115
    Low GIF 160 240 23093
    Medium JPEG 512 768 57691
    High JPEG 1536 2304 522709

    Point of Contact

    Name: NASA Kennedy Space Center

    Address:

    KSC Public Affairs Office
    National Aeronautics and Space Administration
    John F. Kennedy Space Center
    Kennedy Space Center, Florida 32899
    

    NIX Search KSC Search STS-87 Photo Index


    DISCLAIMER: No copyright protection is asserted for these photographs. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. (See NASA Copyright Notice)


    Photos By: National Aeronautics and Space Administration (taken by Bionetics)
    Scanned By: Bionetics and NASA/KSC Internet Lab (Dumoulin, Downs)
    Captions: Sherikon Space Systems (Susan Walsh, Chuck Weirauch and Paula Shawa)
    Curator: NASA/KSC Internet Systems Lab (Dumoulin, Downs, Paladino)
    Last Updated: Tuesday August 28 14:26:28 EDT 2001 (M. Downs )

    A service of the NASA Image Exchange (NIX)